💥 Gate Square Event: #PTB Creative Contest# 💥
Post original content related to PTB, CandyDrop #77, or Launchpool on Gate Square for a chance to share 5,000 PTB rewards!
CandyDrop x PTB 👉 https://www.gate.com/zh/announcements/article/46922
PTB Launchpool is live 👉 https://www.gate.com/zh/announcements/article/46934
📅 Event Period: Sep 10, 2025 04:00 UTC – Sep 14, 2025 16:00 UTC
📌 How to Participate:
Post original content related to PTB, CandyDrop, or Launchpool
Minimum 80 words
Add hashtag: #PTB Creative Contest#
Include CandyDrop or Launchpool participation screenshot
🏆 Rewards:
🥇 1st
China Molybdenum: TFM Mixed Mine achieved the goal of "double standard" as scheduled
Luoyang Molybdenum Industry News: As of June 30th, the average monthly production of cathode copper in the TFM mixed ore east area exceeded 18,000 tons for three consecutive months, reaching 105% of the production target. The average monthly production of cobalt hydroxide exceeded 900 tons, reaching 100% of the production target. At the same time, the quality of cathode copper products reached 99% HG+ST, and the cobalt content of cobalt hydroxide reached above 37%. The planned production volume and quality of the products have both met the standards, which means that the eastern area of the mixed ore has the production capacity of 200,000 tons of copper and 12,000 tons of cobalt per year.